Captive power generation by recovery and utilization of the waste energy

Name of Project “Captive power generation by recovery and utilization of the waste energy (thermal and pressure) of HP steam

Location of the Project (Village / District / State) Assam

Brief Description of the Project The project activity will have two extractions (MP & LP) with one condensing stage. (i) extraction flows to MP and LP steam header from this turbine (ii) RPM of the turbine (iii) load of power generator by adjusting the inlet HP stem flow to HP chest, steam flow to MP chest and steam flow to LP chest i.e. condensing stage. The project activity consists of investment of a STG of rated capacity 12 MW which will run along with the GTG utilizing HP steam going to PRDS and the surplus HP steam from process which is presently being vented. Since GTG operates on fossil fuel; the project activity would reduce the consumption of high carbon fossil fuel-naphtha/natural gas.

Estimate of GHG abatement in tCO2 eq. 170350

Host Country Approval Status Approved

Project Owner / Proponent M/s Numaligarh Refinery Limited, Numaligarh, Assam – 785699. Contact Person: Mr. Ajit Kumar Maiti, Senior Manager-Technical Services

Baseline Methodology “Consolidated baseline methodology for waste gas and/or heat and/or pressure for power generation” Reference: ACM0004, version 02.

Project Start date May 2006.
Project completion date August 2007

Looking for More CDM Projects? Type the company name or keyword in the search box and enter.

No comments:

Post a Comment